Cisco For Data Networking Optical Network 1 X 10gbase Er Optical Fiber 1 29 Gb S 10 Gigabit Ethernet10 30 Gbit S Onssc10ger
Recycle
Conditions Available
Lock
Warranties Available

ONS-SC+-10G-ER
by Cisco
For Data Networking, Optical Network - 1 x 10GBase-ER - Optical Fiber - 1.29 GB/s 10 Gigabit Ethernet10.30 Gbit/s


Description:
The Cisco ONS 15454 10-Port 10 Gbps Line Card consists of 10 Enhanced Small Form-Factor Pluggable (SFP+) based ports and one 100-Gbps Channel Express (CXP) based port. Each of the 10-Gbps SFP+ based ports can support the following services: OC-192/STM-64 (9.95328 Gbps) 10 Gigabit Ethernet LAN PHY (10.3125 Gbps) 10-Gbps Fibre Channel (10.518 Gbps) 8-Gbps Fibre Channel OTU-2 Standard G.709 (10.70923 Gbps) G.709 overclocked to transport 10 Gigabit Ethernet as defined by ITU-T G; Sup43 Clause 7.1 (11.0957 Gbps)
Interfaces/Ports
Interfaces/Ports Details
1 x LC 10GBase-ER Network
General Information
Product Type
SFP+
Manufacturer Part Number
ONS-SC+-10G-ER=
Manufacturer Website Address
http://www.cisco.com
Manufacturer
Cisco Systems, Inc
Product Name
SFP+ ER - Commercial Temp
Brand Name
Cisco
Media & Performance
Network Technology
10GBase-ER
Maximum Data Transfer Rate
10.30 Gbit/s
Ethernet Technology
10 Gigabit Ethernet
Media Type Supported
Optical Fiber
Fiber Mode Supported
Single-mode
Miscellaneous
Compatibility
Cisco ONS 15454 10-Port 10Gbps Line Card
Technical Information
Application/Usage
Optical Network
JUNIPER XFP-10GE-LR

JUNIPER xfp-10ge-lr

in stock ready to ship

JUNIPER EX-SFP-1GE-T

JUNIPER ex-sfp-1ge-t

SFFP 10/100/1KCOPPER XCVR MOD

CISCO ASR1000-ESP40

CISCO asr1000-esp40

ASR1000-ESP40 EMBEDDED SERVICES

CISCO VIC3-4FXS/DID.

CISCO vic3-4fxs/did.

Four port Voice interface Card FXS and DIDE-SX GBIC

DELL 407-BBOR

DELL 407-bbor

LEAD TIME - Dell - SFP (mini-GBIC) transceiver module - Gigabit Ethernet - 1000Base-SX - up to 550 m - 850 nm - for Networking N2048, X1008, X1018, X1026, X1052, X4012; Open Networking S4810; PowerEdge FX2

FINISAR FTLX8571D3BCV-IT

FINISAR ftlx8571d3bcv-it

3-5 days lead.